Hoover/SUL Realignment |
Supplement to Attachment 1 of the 5 December 2000 memo to Provost Etchemendy
These operational steps are subject to and governed by the statement of redistribution of collecting responsibilities in Attachment
Processing
SUL and the Hoover, respectively, will have responsibility for all cataloguing and preservation of the materials which they collect. SUL will integrate the processing of materials for which it assumes responsibility with existing processing programs, using such resources as are now assigned to the Hoover Library for these purposes. To the maximum extent possible, the Hoover Archives and SUL will use the same procedures and library management systems for the acquisitions and cataloguing processes to ensure minimal duplication between the two organizations.
Housing and Servicing of Collections
Our ultimate goal is to integrate those Hoover collections which become the purview of SUL to maintain and keep up to date with those of SUL. Physical transfer of the pertinent Hoover general materials will begin in September 2002. When SAL III becomes available (targeted for September 2002), major shifts and moves of SUL and Hoover collections to Green, Meyer, and SAL can begin. We expect all transfers to be concluded by December 2003. Separate arrangements are proposed for the East Asian Collection which we will transfer in July and August, 2001.
The Hoover Institution will continue to be responsible for circulation and access services of all materials that remain at the Hoover Library and for the Hoover Archives. SUL will assume for responsibility for circulation and access services for all materials transferred from the Hoover Library.
The preservation of Hoover library materials transferred to SUL will become the responsibility of SUL. The Hoover will retain its existing preservation staff to target archives as well as the rare and special books remaining in the Hoover Library.
| Table of Contents | Transmittal Memo | Library Reorganization | Attachment 1 | Supplement to Attachment 1 | Timetable |
| Timetable East Asia | Hoover FAQ | Project Budget |
Keller Letter to Editor | Raisian/Palm Letter to Editor |
| Etchemendy Letter to Editor | Message from the Provost |